We have been operating in the energy field since 2001 in synergy with companies operating in the sector and with professional colleagues from various disciplines to offer the investor customer the security of invested capital.
Wind farm in the Municipality of Erchie Br
Installed power 30MW
The wind plant built in the Municipality of Erchie consists of 15 Gamesa G90 turbines with an adjoining User Cabin and an Electric Station of approximately 1000Mw connected in and out on the Galatina-Taranto Nord network.
The plant was built by EPC TOSHIBA spa and acquired by ALLIANZ.
Construction site images Eolica Erchie - Plant with n.15 Gamesa G90 wind turbines
Location of anemometers
See where the Erchie Br wind farm is located